Con Edison Development Projects header image

White River 2 Solar, CA
Capacity: 26 MW DC / 20 MW AC

# of solar panels: 86,400

Solar panel manufacturer: Yingli (w/ ATI trackers)

Inverter manufacturer: General Electric

System footprint: 165 acres

Commercial operation: Q3 2014

ISO: CAISO

Interconnect: PG&E

Voltage: 115 kV

Annual production: 51,500 MWh




contact us   |   consolidated edison, inc.